Process and Information Automation

Contact usHomeWhat we doWhere we are

 

 

 

 

News

Information Automation

Systems Integration

Custom Software

GPS Tracking

Teleconference Scheduling and Billing System

Process Automation

Batching

Stacking & Retrieval

Data Acquisition

Statistical Process Control

PCS Locking Clip

 

 Select Teleconference Core
for an overview of the system


Maximize Revenue by Optimizing
Bridges


 

Select Services Used at Each Bridge

Enable and disable select services at each bridge.

  • Configure Use of Bridge Services

Change Overflow Span Order for Bridges

Set the order for bridge-to-bridge overflow for large. conferences.

  • Optimize Span Order

Adjust Overbooking Factor at Bridges

Vary overbooking factor as client usage changes.

  • Change Overbooking

Transfer Schedules Between Bridges

Transfer schedules to respond to bridge maintenance and bridge failure.

  • Move Schedules

Disable Scheduling for Bridge Maintenance

Assign time for bridge maintenance and block scheduling to the bridge for that duration.

  • Bridge Maintenance

Preferred Dial-In Numbers

Assign preferred clients their preferred dial-in number.

  • Preferred Dial-In Numbers

Overflow to Virtual Bridge

Bridge Spanning can include Third Party Overflow providers for large conferences.

  • Span Overflow to Virtual Bridge
     
 

Teleconferencing System Solutions
PHILADELPHIA CONTROL SYSTEMS, INC.
Phone: 302.368.4333   

www.pcs4automation.com

 

Copyright 2011, Philadelphia Control Systems, Inc.

 

Home ] What we do ] Where we are ] News ] Information Automation ] Process Automation ] PCS Locking Clip ] Contents ] Contact us ]

Last Update: 11/10/2011